NASA Administrator Jared Isaacman and Energy Secretary Chris Wright signed a new agreement to accelerate cooperation on space nuclear power and propulsion, while Isaacman announced that the agency’s Moon Base timeline is now ahead of schedule.

What Happened

The agreement was signed during the White House Office of Science and Technology Policy’s “Science: A New Golden Age Summit.” It establishes a framework for NASA and the Department of Energy (DOE) to jointly design, build, and deploy space nuclear systems, covering research, testing, launch integration, and operations. This move implements President Donald Trump’s December 2025 space superiority executive order and the NSTM-3 memo, which launched a national space nuclear power initiative. Key projects under this pact include Space Reactor-1 Freedom, a nuclear-electric propulsion spacecraft scheduled to launch to Mars NET 2028, and Lunar Reactor-1, a fission-powered system intended to power the Moon Base with a launch-ready status due by 2030. Isaacman described SR-1 as NASA’s “Nautilus,” marking the first step toward a nuclear-powered NASA.

Why It Matters

Isaacman revealed that NASA will beat the national space policy’s original goal of placing the first Moon Base elements in place by 2030. Instead, the agency plans to launch the first element of the base in December, followed by near-monthly uncrewed robotic missions starting in early 2027. Isaacman emphasized that rovers and hardware will be waiting when astronauts arrive, stating, “We’re leaving no doubts this time.” While the agreement formalizes existing plans rather than introducing new funding figures, industry leaders view it as critical. Antares CEO Jordan Bramble noted that the MoU covers fuel, testing, and launch approvals, distinguishing a “paper design” from an “enduring program” that delivers reactors in 2028 and beyond. The agency is also developing a public website to track the base’s construction in real time.

The Bottom Line

NASA and the DOE have solidified their partnership on space nuclear technology, with Isaacman confirming that the Moon Base’s initial deployment will begin in December 2026, significantly ahead of the 2030 target.